Collaborative Development
Before works began, Ineco collaborated closely with NFU Mutual to secure necessary consents, grid, and planning permissions, and commission independent structural assessments. Detailed designs were developed to ensure best-in-class products were specified for the project.
Safety and Risk Mitigation
To mitigate fire risks, SolarEdge inverters and power optimisers were installed, featuring Safe DC, Arc fault detection, and automatic shutoff technology via a Fire Fighter Gateway. This integration ensures that in the event of a fire, the PV system is safely deactivated for emergency services.
High-Performance Solar Technology
The 249.20 kWp system comprises 560 bi-facial, dual-glass solar panels from JA Solar, mounted on the Van der Valk Valkpro+ L10 flat roof system, ensuring enhanced performance, safety, and longevity. These high-efficiency panels are expected to generate nearly 200,000 kWh annually, powering close to 20% of the building’s energy needs and saving 45 tonnes of CO2 each year.
Delivered safely, on time, and within budget, the project marks the start of a long-term partnership. With a 30+ year lifespan, Ineco will monitor and maintain the system to ensure continued safety and performance.