Kettering Leisure Village Drone Shot 1

Introduction

Kettering Leisure Village has served the Northamptonshire community since the early 1990s, providing sports, fitness and entertainment facilities, including Arena Sports, Balance Health Club and Lighthouse Theatre. The site is managed by Phoenix Leisure Management.

Industry

Sport & Leisure

Technology

Solar Photovoltaic

Location

Northamptonshire

Project Overview

Solar Panels Installed

0.00

System Size (kWp)

0.00

Annual Generation (kWh)

0.00

Payback Period (Years)

0.00

Equivalent electricity rate

0.00 p / kWh

Annual CO2 Savings (Tonnes)

0.00

The Motivation

Since taking over Kettering Leisure Village in September 2023, Phoenix Leisure Management has focused on improving the site’s efficiency, sustainability and long-term future. With significant electricity demand across its leisure facilities, solar PV presented an opportunity to reduce reliance on grid electricity, lower operating costs and reduce carbon emissions.

The Ineco Solution

Coordinating Roof Improvements and Solar Installation

The existing roof required remedial works before solar PV could be installed. Ineco worked alongside a specialist roofing contractor to coordinate both projects, minimising disruption to the operational leisure facility and ensuring the roof was suitable for the long-term solar investment.

Maximising Solar Generation

Ineco designed and installed a 418.5 kWp solar PV system comprising 900 panels, maximising generation from the available roof space.

SolarEdge inverters and module-level optimisers were selected for their enhanced safety features, helping meet insurance requirements while maximising energy yield. The technology also provides advanced system monitoring and extended warranty protection.

Supporting Long-Term Performance

Following commissioning in May 2026, Ineco continues to support the system through a long-term operations and maintenance agreement. Remote monitoring and proactive maintenance help optimise performance, maximise energy generation and protect the customer’s investment throughout the system’s operational life.

The Benefits

The system is expected to generate over 403,000 kWh of renewable electricity annually, meeting approximately 36% of the site's electricity demand and reducing carbon emissions by 78 tonnes per year.

Over its 25-year design life, the system is projected to generate electricity at an equivalent cost of just 5p/kWh. That's approximately 80% cheaper than an illustrative UK electricity rate of 25p/kWh, delivering significant long-term financial and environmental benefits.