Introduction
Great Linford Primary School is a mixed primary school located in the north of Milton Keynes. With 375 pupils aged 4 to 11, the school ranks in the top 20% of schools nationally.
Introduction
Great Linford Primary School is a mixed primary school located in the north of Milton Keynes. With 375 pupils aged 4 to 11, the school ranks in the top 20% of schools nationally.
Industry
Education
Technology
Rooftop Solar PV
Location
Milton Keynes, Buckinghamshire
Solar Panels Installed
0.00
System Size (kWp)
0.00
Annual Generation (kWh)
0.00
Payback Period (Years)
0.00
Equivalent Rate
0.00 p / kWh
Annual CO2 Savings (Tonnes)
0.00
The Motivation
Great Linford Primary School initially upgraded their lighting as part of a wider maintenance program. Although the new fittings were more energy-efficient than the previous ones, they still provided insufficient light levels. Coupled with the ongoing rise in energy bills, the school began to seek ways to reduce costs, enhance the learning environment, and contribute positively to the planet. After consulting with other schools in the area, they reached out to Ineco Energy for assistance in achieving these goals.
The Ineco Solution
Direct Recommendation
Ineco Energy came highly recommended to Great Linford primary school by other schools in the local area. We offered a fully funded solution that would help the school lower its energy costs, improve its environmental sustainability, and create a more conducive learning environment for its students.
Feasibility Survey and Energy Bill Analysis
To determine the most effective energy-saving measures, we conducted a thorough feasibility survey and analysed the school’s energy bills. Our findings revealed significant opportunities for savings, through the installation of LED lighting and solar PV panels as an initial step towards reducing the schools costs and carbon footprint.
Site Audit and Installation
We carried out a comprehensive site audit, gathering building dimensions and compiling a full asset register. Our in-house design team then created a bespoke solution, ensuring the most efficient use of resources with the optimum output.
Asbestos Containing Ceilings
We took special care to work with the existing asbestos-containing materials in the ceilings. Additional health and safety control measures were put in accordance with HSE regulations for all persons.
Better Lighting for Brighter Schools
The new LED lights transformed the school’s learning environment with brighter, more effective lighting. Additionally, the solar panels now provide energy savings, helping to shield the school from future energy price increases.
Improved Learning Environment
The upgraded LED lighting has significantly enhanced the school’s lighting quality, creating a brighter, more comfortable space for both students and teachers.
Cost and Energy Savings
By installing solar PV panels, the school has not only reduced its energy bills but also become more resilient to rising energy costs, contributing to long-term financial savings.